English: 中文版 ∷  英文版

Industry news

10 thousand and 300 LED lights illuminate the torch zone

In order to further implement the conference on Industrial Development in Guangdong province LED lighting industry spirit, to speed up the LED lighting green lighting industry, in 2014 ten the area of practical livelihood, LED energy-saving lamps in the area have been completed the 10300 lights. At the same time, through the establishment of energy-saving intelligent management system, the district has also achieved real-time monitoring of LED street lamps, energy saving control. Next, the district plans to start 7200 streetlights for LED energy conservation.

According to "Guangdong province to promote the use of LED lighting products plan" requirements, in 2014 the area of ten practical livelihood, plans were completed for about 10000 of the traditional street lamp the implementation of energy-saving LED lights, finally completed a total transformation of 10300 new light, street light about 600, the newly completed in 2014 and the transformation of about 3200 light. The LED street lamps and lanterns are in line with the local standard of LED lamps in Guangdong Province, and are recommended in the catalogue of "Guangdong green lighting demonstration cities". After testing, testing and energy audits, the single lamp power saving rate exceeds 65%.

In order to realize the real-time remote monitoring of the street lamp energy-saving, energy saving and comprehensive understanding of road lighting conditions, in order to reflect the technological innovation and management innovation, increase energy-saving intelligent management system for the implementation of energy-saving project torch zone. The system consists of three parts, the computer server system, the monitoring subsystem and the monitoring node. The monitoring sub station is placed on each section and is responsible for communicating with the server system. The monitoring node is arranged inside each LED street lamp, and the nodes are wired by data transmission, and the network is communicated with the monitoring sub station.

According to reports, through the street lighting intelligent management system, you can control the selected sections of the street lights, you can also individually control the street lights to achieve any point function, with flexible switching control function. At the same time, it can also use flexible timing control strategy, based on the position display of the street lamp of the geographical information system, and intelligent inquiry, fault alarm, accurate positioning, and finally make the LED street lamp more energy saving.

And the next step, the torch zone will be rich, six and, and Zhang Jiabian, East, coast 5 communities within 33 communities totaling about 7200 lights (total power of about 256KW) streetlights for energy-saving transformation. At present, construction drawing design, budget audit and other work has been completed, the relevant provisions of the construction process is now in advance, and plans to complete the first half of this year's related transformation work.

Scan the qr codeclose
the qr code