Beijing subway company has entered the construction phase of the 1 and 2 line LED lighting energy-saving projects. The construction of a conservation oriented subway project involving 34 stations, 30 thousand lighting transformation, the project is expected to be completed after the annual saving of 4 million 500 thousand degrees.
In 2012 the Beijing subway company for the first time through the contract energy management completed the 6 Station 2 LED lighting reform pilot interval, annual consumption is 900 thousand degrees, the saving rate of 50%, energy-saving effect is good. To further take advantage of the policy, and for the 12th Five-Year energy situation, the company plans to develop a 1, line two line of LED transformation implementation plan. At present, there are 7 sites under construction at the same time, has now completed 1 line road station, Yongan station, line 2 Jianguomen station, Fuchengmen station, 5 Gulou Street station construction, the entire construction plans completed by the end of May.
Beijing Metro Corporation is the key energy consuming enterprises in 2012, the comprehensive energy consumption of 131 thousand tons of standard coal, of which the power of 853 million degrees (accounting for the total energy consumption of 80%), is the city's electricity supplier.
Contact: mack
Phone: 13332979793
E-mail: mack@archled.net
Add: 3rd Floor, Building A, Mingjinhai Second Industrial Zone, Shiyan Street, Baoan, Shenzhen,Guangdong,China