English: 中文版 ∷  英文版

Industry news

Guangzhou metro line three platform set up 76 sets of LED display

Yesterday, the Guangzhou subway company issued a tender notice, the company will be in the metro line three sites on each side of each station adds 1 display, also on both the installation position of station display the corresponding adjustment in the future, the car can not see the "TV" situation can be greatly reduced. It is reported that the Guangzhou metro line three (Panyu - Guangzhou Tianhe Plaza East, sports road - Passenger Station) with 3 cars in the early opening, in order to meet the needs of three cars, the passenger information display system display terminal with semi platform arrangement on the platform, each side platform is provided with 2 groups of 4 blocks arranged on the screen, the platform part. With the passenger line three requirements, the year before, line three line into six cars running, therefore, the existing display quantity can not meet the requirements, many in the rear part of the waiting passengers are basically can not see the screen, but can not understand that the next train stop time. Tender announcement shows that the installation will be 42 inches LED backlight LCD display has a set of 76, the transfer of both the display screen (each group of 2 screens, the location of re adjustment) a total of 76 groups. At the same time, due to the requirements of the project does not affect the existing operations, such as the case of construction, commissioning, construction and commissioning work to be carried out after the stoppage of the night. Guangzhou subway project requires the successful completion of the unit in September 30th this year to complete the installation and commissioning of the system.

Scan the qr codeclose
the qr code