English: 中文版 ∷  英文版

Industry news

Hangzhou River Interchange LED lighting project completion

The river overpass and elevated river lighting upgrade project the current project has been completed. From the lamp test situation, blue lighting effect of blue and Green River Interchange mixture; river elevated two-way warm white light washing wing of the bridge and bridge the lighting effect of abdominal changed the original dark state, brightness significantly improved. These two projects will be officially unveiled before New Year's day.

The project uses the T5 fluorescent lamp and LED lamp two, T5 fluorescent lamp is warm white, mainly used for lighting, LED lamp with blue and green two kinds of mixed blue light, mainly used to outline the outline of the overpass. LED lights on, T5 lights in the next, 1.2 meters for a group, installation

On the 5 sides of the overpass on both sides of the ramp, a total of 1194 sets of lamps, the formation of a total length of more than 2 km continuous band.

These two days the public drove up the pond elevated, all the way to the north, but also found elevated along the landscape, compared with the past has become very different. On the Gongshu District Urban Management Bureau departments from the second half of this year, proceed to the elevated pond along the Jin Chen apartments, Garden District, to enhance the landscape lighting of silkworm. The two area involving a total of 28 houses, is the city lighting landscape upgrade project over the years to the largest residential floors, completed at the end of last month, and then will fine tune.

At the same time, the second batch of Gongshu District lighting upgrade project has also been fully started, involving white horse building, China Zhejiang Plaza, the new Century Towers and canal square supporting public building. At present, the martial arts district project has been basically completed the work of laying pipelines, the next will be lighting installation; Canal Square publicbuildings project (Canal Museum, the district government building and district court, procuratorate building) has completed the lighting effect test, the next step will be step by step pipeline laying. The second batch of lighting upgrade project is expected to be completed before the end of December.

Scan the qr codeclose
the qr code