English: 中文版 ∷  英文版

Industry news

The green model village into LED, two new solar energy industry of Taiwan reconstruction

According to Taiwan's "Economic Daily" reported that the Taiwan post disaster reconstruction gradually, and the relocation of the village land readjustment has become an important policy, the Taiwan authorities, Ministry of Economic Research on the relocation of the village, built in the town at the same time, collocation of industrial development, planning and design of green energy demonstration village, promote the synchronous light emitting diode (LED) and the solar energy industry and domestic market recently, completion of the program will be announced, is expected to be driven by the wave of business reconstruction.

The funds amounted to more than one hundred billion yuan reconstruction of special regulations, today (27) days to read through three, "the Ministry of the interior", "project" is the statistics should be for the relocation of the village villages and population, coupled with the influx of donations from all walks of life, and nearly 60 enterprises to adopt position reconstruction work, become an important resource in the South Reconstruction of disaster area in Taiwan province.

For post disaster reconstruction not only restoration and rebuilding, taking into account the industrial development, the Ministry of economic affairs called "energy", "industrial bureau and other units, research on collocation" Ministry of the interior "and" Engineering "of the village relocation policy, in addition to the reconstruction, making the town, and cooperate with the new trillion plan" Yuan "and" low carbon city "industrial policy, build green energy demonstration village.

"The Ministry of economic planning in green energy demonstration village, the introduction of LED, two new solar energy industry, solar photovoltaic system is arranged on the roof, residential indoor lighting using LED lights and lamps, and provide perfect sewage reuse system, by the" energy "of the detail plan.

Officials said the number of villages and population reconstruction committee must still be the relocation of the village in statistics, until after the confirmation, and then by the charity and enterprise adoption. Make sure the object and adoption unit after the relocation of the village, ready to move will communicate with the residents of the village, understand their needs, green energy demonstration village will be built in the town village, the future of the "options". Residents are willing to accept, will be in this form as a reconstruction of the community.

Because of the "Executive Yuan" will be solar energy photovoltaic industry and LED lighting green industry leader for the double column, two output is estimated in 2015 to reach trillion yuan scale, the establishment of green collocation model village reconstruction, will also have the significance of promoting the development of the industry, and promote the development of the domestic market.

At present has to adopt enterprises to participate in the reconstruction after the disaster, including the unified group, Delta Electronics, steel, and steel yesterday announced the re invested NT $500 million to participate in the reconstruction project, mainly selected at the bridge engineering, the mobilization of its technology, human full participation.

Scan the qr codeclose
the qr code