At Yangzhou Taizhou airport flight, the project carried out steadily, many jobs are already in place. Reporters yesterday visited found that the site of a busy job.
Maiden flight
Giant LED screen tell story"
The airport navigable soon, yesterday reporters saw the square in front of the main venue, the airport has been inaugurated and the inaugural ceremony on the face. The main venue is divided into two parts of the podium and the audience area, covering an area of more than 4 thousand square meters, can accommodate up to more than 2 thousand people. At present, the main venue floor has been completed, yesterday officially laid a carpet, and placed chairs.
In addition to the huge ceremony of the background wall, standing on both sides of the podium with an area of 120 square meters of LED screen, the audience stand opposite the large LED screen area is up to 150 square meters. According to reports, when the ceremony was held, the three sides of the LED screen will show the story behind the airport construction.
In order to meet the maiden voyage, Yangzhou, Taizhou airport on the square before the green decoration, many flowers arrived yesterday, the green workers are configured.
From Shaobo green worker Wu Hengying, has a busy morning. When the reporter arrived, she was cleaning baskets, waiting for the next batch of flowers. "These two days, we have been working overtime at the airport, all the flowers are our. "Wu Hengying proudly told reporters," it can be said that the construction of the airport has a credit. "
Walking on the road of the airport, there are green workers everywhere in the flowers, especially the upcoming opening ceremony of the airport navigation, the surrounding roads are flowers.
Outside the terminal
Drink 5 glasses of water a day
With the airport navigation approaching, a lot of people come to visit every day, to the airport construction and layout caused some pressure. Reporters on the first floor of the terminal to see, in order to facilitate the management of the terminal only left in the east to enter the channel, where security is also the busiest. At noon, arranged a security; after 2 p.m., has arranged for the three.
Because the airport is still in the layout, many internal projects are underway, in order to facilitate the safety and convenience of the terminal inside the ban to visit, to see the public only allowed to look outside. "A security guard told reporters that many people want to enter the terminal, they must earnestly to explain every day, very hard. A day to drink 5 cups of water, or mouth parched and tongue scorched stand. "
According to reports, just last Saturday and Sunday, every day thousands of people to visit.
Lounge
Security zone glass wall
Enter the waiting hall, the first sight is entering the blue and white numbers lined up. "There is a ticket Island, 01-20 number, each grade are a check-in counter, passengers can check-in baggage card, wait here. 20 cabinets, in addition to a small number of reserved for international airline business, most of the domestic airline business. "
Island on both sides of the luggage compartment. "Flying foreign baggage is separate from the flying home. There is a conveyor belt luggage, luggage as long as the above, it will be sent to the first floor, by the baggage car to the plane. "
Luggage on both sides of the room, it is the security area, the installation of glass wall. "The glass wall has only one partition. "
Contact: mack
Phone: 13332979793
E-mail: mack@archled.net
Add: 3rd Floor, Building A, Mingjinhai Second Industrial Zone, Shiyan Street, Baoan, Shenzhen,Guangdong,China