English: 中文版 ∷  英文版

Product News

CPT new factory installation LCD panel industry turmoil Tim variables

CPT deputy general manager Wu Junyi confirmed that due to the mainstream size large size LCD TV panel is not very clear, the next generation of factory investment based on large, in order to avoid the wrong panel future development situation, coupled with the six generation third Longtan factory built in the next generation of deferred, after the panel factory decided to postpone the delayed start.

China Yingyuan in planning for the future, a total investment of two hundred and twenty billion yuan. AUO, CMO and other manufacturers have been put into the 7.5 generation factory building. Among them, the seven's five generation plant. Due to the second quarter of next year the equipment installed in the fourth quarter, can be mass production, trying to attack the future more than forty inch LCD TV panel market. However, Hua Ying was at this time, to make the next generation of science and technology TFT - LCD plant postponed the decision to set up a plant for half a year, is bound to cause the industry's attention.

Scan the qr codeclose
the qr code