Recently, along the South Tower lighting project is completed, the installation of street lamp 204, the solar energy lights 126, annual electricity savings of 110 thousand degrees.
Tower Road length of 5.2 km, opened at the end of 2005. Due to the power supply line is the end of the road, lack of electricity supply, lighting problems have not been resolved, the surrounding residents travel inconvenience. In order to properly solve the problem of lighting Tower Road, Yuhua District, multi coordination, and change the original design, plans to install 204 street lamps along the road.
, sports Street - Green Garden Street section installation connected with the power of LED (light emitting diode) automatic control energy-saving street lamp 38; sports Street - Zhai Camp Street to install solar energy-saving LED street lamp 96; Tangu Street - Tangu Street section installation connected with the power of LED automatic control system of energy-saving lamps 40 lights; Tangu Street - east ring section to install solar energy-saving LED street lamp 30. Up to now, all the lights have been installed.
Contact: mack
Phone: 13332979793
E-mail: mack@archled.net
Add: 3rd Floor, Building A, Mingjinhai Second Industrial Zone, Shiyan Street, Baoan, Shenzhen,Guangdong,China