In Guangdong Province, Foshan city Chancheng District LED street reconstruction demonstration project as an example, on the ground of the high-power LED street lamp demonstration project (tunnel lamp) 5659 street lamp in Chancheng district was improved, the total investment of 36 million yuan, is divided into two phases. The project started in November 2008, the second phase of the project was completed in December 2009, the full completion of the transformation. The first phase of the completion of the transformation of 926 high-pressure sodium lamp; the completion of the second phase of the transformation of the high-pressure sodium lamp 5434, the actual completion of the two projects led street lamp renovation of a total of 6360. The ground EMC model of this project, the specific operation is as follows:
1 determine the intent of the project: in 2008, the customer (government) to form LED street reconstruction on the ground with the initial intention. To solve the aforementioned LED lamp EMC model transformation problems in application, Qinshang agreed with customers, first install the LED model in the street on the road, to entrust the third party testing institutions of professional performance, LED lamp power saving rate calculation, energy efficiency, and the results were confirmed by both parties. By calculating the power saving rate, the number and the power of the street lamp, the local electricity price and other comprehensive factors, the energy saving benefit of the project transformation is calculated.
2 project: Qinshang according to professional customers street reconstruction scheme and the three party testing data, analyze the feasibility of LED street reconstruction project, the feasibility analysis includes the advanced technology, reasonable light distribution, street reconstruction project investment plan, funding sources, project operation mechanism, social economic evaluation in the feasibility; the report agreed after the project was officially approved, KingSun company further planning and engineering design of street reconstruction project.
3 project financing: Qinshang according to the project funding requirements, contact the financial institutions, financial institutions to review the feasibility report of the project and customer financial ability to pay, also on ground level quality of production capacity, technical guarantee of corresponding assessment system, the corporate financial strength, bank credit status, determine the project financing, and then by the ground, customer and financial the amount of financing and institutions agreed repayment.
4 contract: consistent with financial institutions in all aspects, the customer signed a project contract and on the ground, with project contract and financial institutions signed a financing contract. The client determines the amount of financing, the term of the contract, the mode of repayment and the proportion of the proceeds of the two sides according to the project capital demand and the expected future electricity saving income. This project adopts the matching repayment, the contract period of six years, energy efficiency share starting date for the meeting on the project acceptance after 1 days, the benefit share for a period of 6 years, the customer, the two sides of EMC share of the total energy efficiency of 6 years according to the agreement, often get normal income lamps.
5 the implementation of the project: customers pay KingSun LED Street projects, energy-saving projects to start construction, LED lamp installation and commissioning of the project completed on time, and reached the standard of engineering design quality.
6 customer service service: LED street lamp is put into use, KingSun company responsible for street maintenance work, the customer is responsible for operation and monitoring work of energy-saving lamps. Qinshang do 5 years free replacement of quality assurance and commitment to product life insurance companies, in order to ensure the interests of users and financial institutions.
7 energy saving revenue sharing: the customer will save electricity annually and save the maintenance fee income as the total energy efficiency of the project. Customers and EMC in accordance with the contract agreed to share the proportion of energy efficiency.